z

    z

    Wheeling University

    In 2016, Wheeling Jesuit University College of Engineering utilized the TuneFilter (originally named T7 EMI Facility Filter) for their EGR481 Capstone Engineering Project for their senior students. Aligning with their mission to examine new technologies, and due to the Tune’s real-world application, students conducted a 14-month installation and measurement project in the 155,000 square foot McDonough Athletic Center as their “Pilot” building located on campus.